Your are here:Home | News&Events | News & Notes | Content

Categories

New technology to speed up the building of Yiwu Fair

Source: Yiwu sourcing agent    Author:       Date: 2008-11-28

A project called "HR heavy door-frame formwork system works" technology is being applied to China (Yiwu) International Commodities Fair-specific stadium construction in the Second Section. Yesterday afternoon, in the construction site-specific stadiums, from the city of Quality Supervision Station building, An Jian station and venue construction units, construction of more than 50 engineers and technicians to discuss with the technology to watch.

Zongze Road and is located in Dong Lu Department of Fair cross-specific venues in our city is the focus of one of the projects, including the exhibition hall and five-star hotel set in two parts, with a total land area of 219 mu with a total construction area of more than 29.6 M with a total investment of 1.8 billion. The project area of single-layer, high-storey, long-span beam, if the fastener used in the past supporting-mode system steel pipe, a large quantity of steel, wear and tear, high labor intensity, low-efficiency construction, "HR heavy engineering portal Formwork system "has a large capacity, with flexibility, efficiency, and other construction advantages. According to experts, the construction of the latter days, only about one-fourth of the former.



Prev:Selling season for New-Year paintings arrives   Next:Yiwu has its own football league